Relevant laws
- High Pressure Gas Safety Control Act
Applicable legal provisions
Enforcement Regulation
- Article 76 (Application for Technical Review)
- Article 8 (Standards for the Facilities and Technology of High-Pressure Gas Manufacturing, etc.)
Annexes in Enforcement Regulation
- [Annex 1] Criteria for calculating storage capacity
- [Annex 2] Protection facilities - The distance from existing buildings, etc. must be checked before selecting a storage location
- [Annex 5] Standards for the facilities and technology for the general manufacturing of high-pressure gases
- [Annex 8] Standards for the facilities and technology for high-pressure gas storage
Contents of Technical Review
- Facility installation plans
- Facility standards (Refer to the Annex in the Enforcement Regulation of the High-Pressure Gas Safety Control Act)
- Technology standards (Refer to the Annex in the Enforcement Regulation of the High-Pressure Gas Safety Control Act)
- Attached materials (Drawings, bills, etc.)
List of attachments for technical review
- Overall layout
- Safety distance
- Explosion-proof area classification map
- Architectural drawing of the storage room
- P&ID
- Resources on Tube Trailer
- Calculation of pipe thickness
- Calculation of safety valve discharge capacity
- Geological survey results